Iraq, including the investigated watershed, has endured destructive floods and drought due to precipitation variability in recent years.Protecting susceptible areas from flooding and ensuring water supply is essential for maintaining basic human needs, agricultural production, and industry development.Therefore, locating and constructing storage st
A Simple Procedure to Obtain the Grounding Resistance Measurement of Very Large and Urban Electrodes by a Modified Fall-of-Potential Method
The measurement of the grounding resistance of grounding grids in large installations as well as grounding electrodes in urban areas is addressed in this article.The resistance value is obtained using a three-pin array by measuring the fall-of-potential on the ground surface.The Elevation Can resistance measured by this method is adjusted to its tr
Economic Evaluation of Denosumab for Treatment of Postmenopausal Osteoporosis: A Systematic Review
Background: We aimed to review the systematic economic evaluation of denosumab versus than alternative drugs and oral bisphosphonates of postmenopausal osteoporosis in women and help health system policy makers for prioritizing and optimally allocate limited health resources.Methods: We examined the databases of PubMed, Web of Science, Embase, Scop
All-synchronized picosecond pulses and time-gated detection improve the spatial resolution of two-photon STED microscopy in brain tissue imaging
Super-resolution in two-photon excitation (2PE) microscopy offers new approaches for visualizing the deep inside the brain functions at the nanoscale.In this study, we developed a novel 2PE stimulated-emission-depletion (STED) microscope with all-synchronized picosecond pulse light sources and time-gated fluorescence detection, namely, all-pulsed 2
Penalty model for delay of bidding section construction period in South-to-North Water Diversion Eastern Route Project from perspective of programs
According to the multi-project and program management theory, this paper analyzes the program generation principle and establishes a program based on progress goals.On the basis of the present situation of calculation of penalty for delay of the bidding section construction period with the critical path method, we studied the effects of contractor-